KRECO | Starlink & SatNet Power Supply FAQ Series — Article 24
Short answer: To buy the right SatNet Power Supply in 2026, follow seven steps. 1) Identify the terminal: Mini ≈30W with native 12–48V DC; Standard 4 / 4 X and Enterprise 75–100W (peaks ≈195W); Flat High Performance / Performance Gen 2 110–150W (200W max). 2) Pick the path: original AC PSU on a pure sine wave inverter ≥500W (800–1000W rec, 1000W+ FHP), official Standard DC-DC (12–48V → 56V/3.57A ≈200W), APSU (AC + DC 12–57V → 57V, accepts 51.2V LiFePO4), or a wide-input DC-DC boost (10–60V in → 56–57V out, ≥200W; 340W class for FHP). All non-Mini terminals need proprietary passive PoE 56–57V on pins 1236+ / 4578- — never 802.3af/at. 3) DC-DC checklist: 10–60V input, regulated 56–57V, ≥200W (≥340W FHP), peak headroom, OVP/OCP/OTP/SCP + reverse polarity, IEC 62368-1. 4) Injector checklist: passive, exact pinout, correct wattage, gigabit surge-protected pass-through. 5) UPS checklist: battery-backed outlets only; W = VA × PF; 1000Wh → Mini ≈28 h @30W, Standard 4 ≈8.5 h @100W, FHP ≈5.7 h @150W; 24 h usable ≈1 kWh (Mini) / 3 kWh (Standard 4) / 4.2–5 kWh (FHP) + 15–20% cold margin. 6) Solar ≈ daily Wh ÷ 3.5. 7) Cable/fuse: dish limits 45 m / 25 m / 50 m, correct AWG, fuse, XT60/Anderson, bond the earth terminal.
| Terminal | Power Profile | Native DC Input? | Dish-Side Feed | Cable Limit | Key Buying Note |
|---|---|---|---|---|---|
| Starlink Mini | ≈30W (idle ≈20W; peak 40–50W; winter 40–45W); ≈0.7 kWh/day | YES — 12–48V DC + USB-C PD 60W (20V/3A) | Direct DC or USB-C (no PoE) | Mini DC cable (bare leads) | Only terminal with native low-voltage DC. 48V LiFePO4 (51.2V) must be bucked to 24V |
| Standard 4 | 75–100W avg; idle ≈20W; peaks approach 195W; winter ≈90–120W | NO | 56–57V proprietary passive PoE, 1236+ / 4578- | 45 m (15 / 22.8 / 45 m options) | UTP-253L 195W dual-port brick — Port A dish, Port B router (Router Mini optional) |
| Standard 4 X | 75–100W avg; peaks 150–200W | NO | 56–57V proprietary passive PoE, 1236+ / 4578- | 45 m | ~150W brick feeds Router 3 only; Router 3 injects PoE and must stay powered |
| Enterprise | 75–100W avg; snow melt ≤40 mm/h; wind operational 96 kph+ | NO | 56–57V proprietary passive PoE, 1236+ / 4578- | 50 m (164 ft) Enterprise cable | PSU 100–240V ~6.3A, IP66, dedicated earth terminal; NO router included — add your own firewall/SD-WAN |
| Flat High Performance (Performance Gen 2) |
110–150W avg; 200W max; snow melt ≤75 mm/h; 140° FOV | NO | 56–57V (or ~54V in 340W-class) proprietary passive PoE, 1236+ / 4578- | 25 m Starlink cable | In-motion capable; needs Mobile Priority / Maritime plan; Wedge Mount included; PSU same 100–240V ~6.3A |
| Path | How It Works | Best For | Must-Check |
|---|---|---|---|
| Original AC PSU (mains / shore / generator) | PSU 100–240V ~6.3A → dish via proprietary PoE | Sites with reliable AC | Bond the dedicated earth terminal; keep all original parts for warranty |
| Pure sine wave inverter + original PSU | Battery → inverter → AC PSU | Off-grid when keeping the AC PSU | ≥500W, 800–1000W rec., 1000W+ for FHP; pure sine wave ONLY; check idle draw & LVD |
| Official Standard DC-DC | 12–48V in → 56V / 3.57A ≈200W, XT60, IP66, −40 °C to 60 °C | 12V/24V battery systems (Standard 4 / 4 X / Enterprise) | 48V cap — 51.2V LiFePO4 EXCLUDED; size for peak, not average |
| APSU (UTP-252C) | AC 100–240V + DC 12–57V in → 57V out, IP68, integrated LAN, wall/DIN-rail | 48V LiFePO4 (51.2V) banks; hybrid AC+DC; DIN-rail cabinets | Starlink recommends DC input >20V (below that output derates) |
| Third-party wide-input DC-DC boost | 10–60V in → regulated 56–57V out, ≥200W continuous | One module for 12V / 24V / 48V and 51.2V LiFePO4; cold/peak headroom | Continuous rating, protections, IEC/EN 62368-1, wide temp |
| 340W-class DC-DC (for FHP) | ≈54V / 6.3A from 12V or 24V; input ≈11.5–30V | Flat High Performance / Performance Gen 2 | Matches 110–150W avg and 200W max; surge/OVP/UVP/OCP |
| Mini direct / USB-C PD | 12/24V fused direct, or 60W PD (20V/3A); 48V bank → buck to 24V | Mini nomad / emergency / outreach kits | Fuse 10A@12V, 5A@24V; true 60W PD; disable ECO/auto-shutoff |
| Check | Requirement |
|---|---|
| Input voltage range | 10–60V DC — covers 12V, 24V, 48V and 51.2V LiFePO4. A 12/24V-only unit is over-volted by a 48V bank |
| Output | Regulated 56–57V DC (Standard 4 / 4 X / Enterprise); ≈54V / 6.3A for the 340W-class FHP module |
| Continuous power | ≥200W for Standard / Enterprise (peaks ≈195W); ≥340W for Flat High Performance (200W max + headroom) |
| Peak headroom | Must hold regulation through startup + Snow Melt. Never size to the 75–100W average |
| Protections | OVP / OCP / OTP / SCP + reverse-polarity + battery-discharge (low-voltage) protection |
| Efficiency | ≥85–90%; prefer DC-DC over an inverter to avoid 15–30% double-conversion loss |
| Standard | Designed to IEC/EN 62368-1 (IT/AV). Not IEC 60601 — that is KRECO's medical adapter range |
| Environment | IP66 / IP67 if outdoors; operating temp −30 °C to 50 °C (wider for cold); shaded, vented enclosure |
| Connectors | XT60 / Anderson Powerpole input; correct output connector; RJ45 PoE if the injector is integrated |
| Cold & snow | Keep Snow Melt Auto; add 15–20% battery capacity; verify cold-start behaviour |
| Check | Requirement |
|---|---|
| Type | PROPRIETARY PASSIVE PoE — NOT IEEE 802.3af / at / bt. Active PoE performs a handshake at ≈48V and will not power Starlink |
| Pinout | +V on pins 1,2,3,6 and −V on pins 4,5,7,8 (1236+ / 4578-) |
| Voltage | 56–57V DC (Standard 4 / 4 X / Enterprise); ≈54V for the 340W-class FHP injector |
| Wattage | ≥195W (Standard 4); ≥150W, 200W rec. (Standard 4 X); ≥340W (Flat High Performance) |
| Data | Gigabit pass-through with surge/ESD protection on the data pairs |
| Connector | Matches the proprietary dish cable; no generic couplers or extensions |
| Never | A standard 802.3af/at PoE switch — wrong voltage, wrong pinout, requires a handshake |
| Check | Requirement |
|---|---|
| Outlet type | Use battery-BACKED outlets only — never surge-only (a surge-only outlet gives zero runtime) |
| VA vs W | W = VA × power factor (~0.6–0.7). A 1500VA unit may deliver only ≈900W — size by W, not VA |
| UPS vs hours | A VA-rated UPS gives minutes (1500VA/900W ≈60–90 min). A LiFePO4 station / DC-UPS rated in Wh gives hours |
| Runtime formula | Runtime (h) ≈ Capacity (Wh) × 0.85 ÷ Load (W) |
| 1000Wh examples | Mini ≈28 h @30W; Standard 4 ≈8.5 h @100W (≈7.1 h @120W plan); FHP ≈5.7 h @150W |
| 24 h usable capacity | Mini ≈1 kWh; Standard 4 ≈3 kWh (plan 120W); FHP ≈4.2–5 kWh @150W. Add 15–20% cold margin |
| Battery chemistry | LiFePO4 preferred (2000–5000+ cycles, deep discharge). A "48V" pack is 51.2V nominal (charges ≈58.4V) |
| DC-UPS | Preferred off-grid: no inverter loss, auto-restart after depletion, MPPT solar input |
| Critical sites | Bridge Starlink's 15–20 min reboot gap; put Router 3 (Standard 4 X) on backup power too |
| Mini caution | Disable ECO / auto-shutoff — a light ≈30W Mini load can make a station switch itself off |
| Check | Requirement |
|---|---|
| Waveform | PURE SINE WAVE only. Modified/square wave makes the Starlink PSU buzz, overheat or fail |
| Inverter rating | ≥500W (Starlink guidance); 800–1000W recommended; ≥1000W for Flat High Performance (PSU nameplate 6.3A + 200W peak) |
| Idle draw & LVD | Include inverter idle draw (≈0.5–2A) in off-grid budgets; set the low-voltage disconnect correctly |
| Solar formula | Required solar ≈ daily Wh ÷ (peak sun hours × 0.7); at 5 sun hours ≈ daily Wh ÷ 3.5 |
| Solar sizing | Mini ≈250–400W; Standard 4 / Enterprise ≈600–800W+; FHP ≈800–1200W+ |
| Charge controller | MPPT (not PWM) for efficiency; LiFePO4-compatible charging profile |
| Winter derating | Derate winter harvest (low sun, cloud, snow); keep panels clearable; add 15–20% battery |
| Check | Requirement |
|---|---|
| Dish cable limit | Standard 4 / 4 X 45 m (15 / 22.8 / 45 m options); Enterprise 50 m; FHP 25 m. Never extend with generic Cat5e/Cat6 or couplers |
| Remote power | For longer runs: supply in an IP66 enclosure near the dish; proprietary cable short (1–3 m); data via Cat6 ≤100 m |
| DC gauge (high-power 200W+) | 12V → 10 AWG (≤5–8 m); 24V → 12 AWG (15–30 m); 48V → 14 AWG (30–60 m) |
| DC gauge (Mini ≈30W) | 12V → 14 AWG (≤5 m), 12 AWG 5–10 m; 24V → 16 AWG (≤30 m), 14 AWG 30–60 m |
| Fusing | Mini: 10A @12V, 5A @24V. Standard-class 200W feed: converter input current +25% (≈25–30A @12V, ≈12–15A @24V). FHP 340W: ≈40A @12V, 20–25A @24V |
| Connectors | XT60 / Anderson Powerpole; IP68 cable glands; drip loops; dielectric grease; UV-resistant cable |
| Grounding & surge | Bond the PSU dedicated earth terminal; fit an outdoor Ethernet/PoE SPD; mast air terminal if highest point |
| Scenario | Terminal | Recommended Power Path | Backup Target |
|---|---|---|---|
| Nomad / remote work (parked) | Mini | Direct fused 12/24V + USB-C PD 60W; 500Wh–1kWh station + 250–400W solar | 8–24 h (1 kWh ≈28 h dish-alone; ≈7.7 h for a ~110W office) |
| Off-grid cabin / homestead | Mini (low power) or Standard 4 (full-time) | Mini: direct 24V + buck from 48V bank. Standard 4: wide-input DC-DC / APSU + 3 kWh bank + 600–800W solar | 24 h – multi-day |
| RV / van (parked work) | Mini or Standard 4 | Mini direct 12V from house battery + DC-DC charger; Standard 4 needs DC-DC step-up or pure sine inverter ≥500W | 8–24 h + alternator / solar |
| In-motion / maritime | Flat High Performance (Performance Gen 2) — REQUIRED |
340W-class DC-DC (≈54V/6.3A from 12/24V) or AC PSU on pure sine inverter ≥1000W; ABYC tinned cable, galvanic isolator, SPD, earth terminal bonded. Confirm Mobile Priority / Maritime plan | Continuous while moving / offshore |
| Emergency / disaster kit | Mini primary (+ Standard 4 for fixed) | Mini: 12V vehicle harness + 60W PD bank + 250–400W solar; Standard 4 fixed on UPS/DC-UPS battery-backed outlets. Layer both | 4 h / 24 h / 72 h tiers |
| Community shelter / school | Enterprise (fixed) or Standard 4 X | Enterprise: own firewall, wide-input DC-DC / APSU, 50 m cable, earth terminal bonded; UPS + solar/MPPT/LiFePO4 + generator ATS. Router 3 (4X) must stay powered | 8 h (school day) / 72 h (shelter) |
| Field hospital | Enterprise or FHP + separate IEC 60601 medical power | SatNet path: IEC 62368-1 DC-DC + DC-UPS. Clinical loads: KRECO KRE048MPS–KRE480MPS medical supplies. NFPA 110 / NFPA 99 + AHJ | 72 h+, N+1 |
| Enterprise fixed site | Enterprise | AC PSU (earth terminal bonded) or APSU; no router — add firewall/SD-WAN; confirm CGNAT / routable IP needs | UPS bridge for the 15–20 min reboot gap |
KRECO Group — an IEC 60601 medical & industrial power manufacturer since 2008 (Equity Code 891359, Medical Reg. 20200118#, FIME Silver Sponsor) — is one of the few manufacturers able to supply both halves of a site: the IEC/EN 62368-1 SatNet Power Supply for connectivity and the IEC 60601-1 medical power for clinical equipment.
Inquire Now: sales@kreco.com.cn | iPSKRE Power Ecosystem | Starlink-compatible SatNet Power Supply OEM/ODM — wide-input DC-DC, passive PoE injectors, DC-UPS & IP66 enclosures under development, plus IEC 60601 medical power in production.
Based on Starlink official Specifications & Help Center (Mini: 12–48V DC native input and USB-C PD 60W / 20V-3A, ~20W idle / 20–40W avg ≈30W, 0.7 kWh/day; Standard 4 / 4 X: V4 dish IP67, 75–100W avg, idle ~20W, proprietary passive PoE 56–57V on pins 1236+ / 4578-, UTP-253L 195W, Standard 4 X ~150W brick to Router 3 with Router 3 always powered, dish cables 15 / 22.8 / 45 m; Enterprise: 75–100W, 110° FOV, IP67 Type 4, snow melt ≤40 mm/h, Enterprise Cable 50 m, PSU 100–240V ~6.3A 50–60 Hz IP66 −30 °C to 50 °C with dedicated earth terminal, NO router included; Flat High Performance / Performance Gen 2: 110–150W avg, 200W max, 140° FOV, dish IP56 / PSU IP66, snow melt ≤75 mm/h, Wedge Mount Kit, 25 m cable, in-motion with Mobile Priority / Maritime plans; DC-DC 12–48V in → 56V/3.57A ≈200W XT60 IP66 −40 °C to 60 °C; APSU UTP-252C AC 100–240V + DC 12–57V → 57V IP68 with DC >20V recommended; third-party FHP DC solutions ~340W class ≈54V/6.3A, ~11.5–30V input; pure sine wave inverter ≥500W guidance; Starlink reboot/re-acquire ≈15–20 min; default CGNAT addressing) plus KRECO medical series data (IEC 60601-1 4th Edition, 2×MOPP, ≤100 µA leakage, Medical Reg. No. 20200118#, KRE006MPS–KRE480MPS) and 2026 procurement practice. Sizing uses Runtime = Wh × 0.85 ÷ W, battery Wh = W × h ÷ 0.85, and solar ≈ daily Wh ÷ 3.5 (5 peak sun hours, ~70% efficiency). KRECO is not affiliated with or endorsed by Starlink/SpaceX; Starlink-compatible SatNet Power Supply modules are under development. SatNet modules are IEC/EN 62368-1 industrial products and are NOT medical devices — clinical and life-support equipment must be powered from IEC 60601-1 medical supplies, and emergency power systems must comply with local electrical code, NFPA 110 and, for healthcare occupancies, NFPA 99. Always use licensed installers for mains, generator, grounding and lightning-protection work, bond the earth terminal, test every power path regularly, and keep original Starlink parts for warranty.